Tuesday, November 18, 2014

Panasonic Lumix DMC-FP1 DMC-FP2 Service Repair Manual


Panasonic Lumix DMC-FP1 DMC-FP2 Service Repair Manual Download
Content:  Service Repair Manual
File type: PDF
Language: ENGLISH

TABLE OF CONTENTS
1 Safety Precautions----------------------------------------------- 4
1.1. General Guidelines---------------------------------------- 4
1.2. Leakage Current Cold Check--------------------------- 4
1.3. Leakage Current Hot Check (See Figure 1.) ------- 4
1.4. How to Discharge the Capacitor on
E.Capacitor P.C.B. ---------------------------------------- 5
2 Warning-------------------------------------------------------------- 6
2.1. Prevention of Electrostatic Discharge (ESD)
to Electrostatically Sensitive (ES) Devices---------- 6
2.2. How to Recycle the Lithium Ion Battery (U.S.
Only) ---------------------------------------------------------- 6
2.3. Caution for AC Cord(For EB/GC/GH) ---------------- 7
2.4. How to Replace the Lithium Battery ------------------ 8
3 Service Navigation----------------------------------------------- 9
3.1. Introduction-------------------------------------------------- 9
3.2. General Description About Lead Free Solder
(PbF)---------------------------------------------------------- 9
3.3. Important Notice 1:(Other than U.S.A. and
Canadian Market) ----------------------------------------- 9
3.4. How to Define the Model Suffix (NTSC or PAL
model) -------------------------------------------------------10
4 Specifications ----------------------------------------------------14
5 Location of Controls and Components ------------------15
6 Service Mode -----------------------------------------------------17
6.1. Error Code Memory Function--------------------------17
6.2. ICS (Indication of additional Camera Settings
when picture was taken) function---------------------19
7 Service Fixture & Tools----------------------------------------21
7.1. Service Fixture and Tools-------------------------------21
7.2. When Replacing the Main P.C.B.---------------------22
7.3. Service Position-------------------------------------------22
8 Disassembly and Assembly Instructions ---------------23
8.1. Disassembly Flow Chart --------------------------------23
8.2. PCB Location ----------------------------------------------23
8.3. Disassembly Procedure---------------------------------24
9 Measurements and Adjustments---------------------------31
9.1. Introduction-------------------------------------------------31
9.2. Before Disassembling the unit ------------------------31
9.3. Details of Electrical Adjustment -----------------------33
9.4. After Adjustment ------------------------------------------36
10 Maintenance-------------------------------------------------------37
10.1. Cleaning Lens and LCD Panel ------------------------37

Download Service Manual Now!
Post ID: 4982279019318878711

No comments:

Post a Comment